INTEGRATED DESIGNING IN POWER INDUSTRY

LT | ENG | RUS
Certificates & Licences | Projects | Staff | Partners | Contacts
Certificates & Licences | Projects | Staff | Contacts
Projects | Vacancies | Contacts
Bank Details | Staff | How To Find Us
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

PROJECTS

 

All projects of "TECOS" have been performed at a top level of engineering in accordance with strict national and international standards applicable for the nuclear industry.

 

 

 

Energy


Client: State Enterprise Ignalina Nuclear Power Plant, Lithuania

  • 2005 Working Design for changing of the water level different on rotating grids of coastal pump station bld. 120/2.

  • 2005 Working Design for changing in accompanying circuit of Control and Protection System and DAZ (additional emergency protection) system at INPP Unit 2.

  • 2005 Working Design for modification of start-up algorithm of switching the service water pumps of INPP Unit1.

  • 2006 Working Design of nitrogen gas supply system installation for INPP Unit 2 accident localization system.

  • 2006 Technical Design of emergency power supply of the main required equipment and devices in the case of full loss of the back-up power supply of INPP.

  • 2007 Technical & Working Design for reconstruction of the rooms 119, 130, 131, 141, 002 of INPP bld. 130/1 for installation of Cementation Facility for processing of the liquid radioactive wastes.

  • 2007 Working Design for installation of the beyond design accident fuel temperature monitoring sensors for reactor of the Unit 2.

  • 2007 Technical & Detailed Design of site preparation for construction of the Project B2 (SWMSF) facility.

  • 2008 Technical & Detailed Design for reconstruction of INPP technical documentation archive premises.

  • 2016 Access for personnel into INPP bld. 130/2 later on dismantling of bld. 129 options analysis. Technical Design preparation based on rational option.

  • 2016 INPP Information Centre options analysis for location and construction.

Client: AS Narva Elektrijaamad (Baltic power plant), Estonia

  • 2005 Technical Design for reconstruction of coastal pump station Nr.2.

  • 2006 Technical Design for reconstruction of fire protection system for transformers of coastal pump station.

  • 2006 Technical Design for reconstruction of pump station on 2nd rise of service and drinking water.

  • 2008 Preliminary & Working Design for reconstruction of main pipelines for heating water.

Client: NUKEM Technologies GmbH, Germany

Works & Services for Projects:

В-1 – Interim Spent Fuel Storage Facility (ISFSF).

В-2/3/4 - Solid Waste Management and Storage Facility (SWMSF).

В-9.2 - Development of the INPP Unit V1 equipment dismantling and decontamination project.

  • 2007 Project B-1. Engineering & Design documentation preparation for rod of camera assigned to inspect the irradiated spent nuclear fuel assemblies (SNF) located in the INPP cooling ponds.

  • 2007 Project B-1. Program of performance preparation for video inspection of heavy damaged fuel (HDSNF) located in the INPP cooling ponds.

  • 2008-2009 Project B-1. Development of heavy damaged spent nuclear fuel handling system & technological process. Technical Design & Engineering documentation.

  • 2009-2010 Project В-9.2. Structural and Architectural parts. Strategy development. Technical & Working Design; Knowledge transfer.

  • 2010-2015 Project B-1./ Fuel Bundle Handling Equipment (FBHE) - reloading machine. Installation design (IDD); Mechanical & Electrical installation; Existed equipments relocation; Participation in testing, cold trials & commissioning.

  • 2011 Project В-4. Gantry cranes 10t & 20t. Design (IDD); Mechanical installation; Civil works.

  • 2011-2017 Project B-1. SNF Transportation system. Transporter’s CONSTOR M2 laser positioning system for INPP Units 1&2. Design IDD+MDD; Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2011-2015. Projects В-1/3,4. Technological equipment’s installation detail design drawings preparation (IDDD) & design supervision. Prepared over 230 designs.

  • 2012-2017 Project B-1. Radiation Monitoring System (RMS). Design (IDD); Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2012-2013 Project B-3/4. General Designer functions fulfilment.

  • 2013-2017 Project B-1. Railway gates “Hertmans” replacement with „Sommer” gates. Design (IDD); Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2013-2017 Project B-1. Spent Nuclear Fuel Inspection Hot Cell (FIHC). Design (IDD); Technological equipment Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2014-2017 Project В-4. Gantry cranes 10t & 20t. Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2014-2017 Project B-1. Methane Gas System (MGS). Design (IDD); Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2017-2019 Project В-1. Equipment for handling with damaged and heavy damaged Spent Nuclear Fuel (DSNF). Designs for manufacturing (MDD) & installation (IDD); Manufacturing arrangement; Design supervision; Delivery; Testing; Knowledge transfer; Training provision to Employer’s personnel.

Client: UAB МЕRКО Statyba, Lithuania

  • 2011 Technical & Working Design for external sewage system for Projects B-1/3,4.

Client: VT Nuclear Service Ltd. Responsibilities taken by Babcock Nuclear Ltd. UK

  • 2009-2012 Project В-9.2. Development of the INPP Unit V1 (gas circuit) technological equipment’s dismantling and decontamination designs.

Client: Lithuanian Energy Institute (LEI), Lithuania

  • 2011 Project В-9.2. Development of the INPP Unit V1 (gas circuit) technological equipment’s dismantling and decontamination designs.

Client: Gesellschaft für Nuklear Service mbH, Germany with participation of Lithuanian Energy Institute (LEI), Lithuania

  • 2010-2017 Project B-1. Casks CONSTOR М2 (102t.) Shock Absorbers Type 1, 2, 3 replacements at INPP Units 1&2. Design (IDD). Method statement. De-installation works, Installation. Warranty period.

  • 2013 Project B-1. SPH in the cooling ponds floor levelling. Conceptions development.

  • 2014-2015 Project B-1. SPH in the cooling ponds floor levelling. Design (IDD+MDD); Mechanical installation; Especial compounds pouring: ChockFast & Belzona.

  • 2015-2017 Project B-1. Cask’s CONSTOR М2 handling system equipment’s arrangement & installation. Warranty period.

Client: UAB Ekobana, Lithuania

  • 2005 Working design for installation of emergency operation recording devices INPP diesel generators.

Client: AB Pramprojektas, Lithuania

  • 2006 Technical design for relay protection and 6kV power distribution station of INPP B-1 Project (Interim Spent Fuel Storage Facilities).

Client: UAB ETB, Lithuania

  • 2006 Engineering documentation for installation of the new servo drives AZ/BSM for INPP Unit 2 Diverse Shutdown System.

Client: OU Altranet, Estonia

  • 2008 Technical Design for emergency renovation of unmovable support of heating line No.1 Narva city (Estonia).

Client UAB VILSTATA, Lithuania

  • 2009 Technical and Working Design of 1st level buildings 31A INPP.

  • 2009 Technical and Working Design for landscaping works of the Project B-10 (Free Release Measurement Facility - FRMF).

Client: UAB DUMTRAUKIS, Lithuania

  • 2009 Technical and working design for general renovation of brick build smoke stack Н=100m (with duct channel) located on INPP industrial boiler station site.

Client: UAB ЕТС, Lithuania

  • 2009 Technical and working design for demolition of existing brick build smoke stack Н=45 m and installation the new metal smoke stack Н=45 m located on INPP industrial boiler station site.

  • 2009 Technical and working design for demolition of existing steel smoke stack Н=35 m and installation the new metal smoke stack on existed foundation located on INPP industrial boiler station site.

  • 2009 Technical and working design for reconstruction of heating system of the industrial boiler station.

Client: UAB FIMA, Lithuania

  • 2009 Technical and detailed design of the cable bridge to the Projects B-10 (Free Release Measurement Facility - FRMF) building.

Industry


Client: OU Altranet, Estonia

  • 2008 Engineering and design documentation for adaptation of supporting steel constructions for storage tanks (GGS-5) of slate processing workshop located in VKG Oil AS plant. Kohtla-Jarve city, Estonia.

  • 2008 Engineering and design documentation for steel constructions of 1000 tones gas-producer of slate processing workshop located in VKG Oil AS plant. Kohtla-Jarve city, Estonia.

Client: UAB ESPro, Lithuania

  • 2007 Works implementation design for roof covering of workshop located in reinforced concert production plant.

Civil construction


Client: State Enterprise Visagino statybininkai, Lithuania

  • 2005 Technical & Working Design for reconstruction and restoration site 26.5ha for Project B-2 INPP.

Client: TUB Trevis ir KO, Lithuania

  • 2005 Technical & Working Design for car washing station.

Client: Visaginas municipality, Lithuania

  • 2006 Technical & Working Design for rearrangement and installation of the new equipment in the rooms of “Sedulinios” school.

  • 2008 Technical Design for reconstruction of the sport sites of “Atgimimo” school.

  • 2008 Technical & Working Design for reconstruction of engineering system of the children’s creativity house.

Client: Church of St. Panteleimon, Visaginas, Lithuania

  • 2009 Working Design for construction of laps and stairways in bell tower.

Client: UAB „Palink”, Lithuania

  • 2011-2012 Supermarket „IKI“ located in Visaginas reconstruction. Technical & Working design in the following parts: general, architectural, site preparation, structural, fire protection, internal & external engineering networks. Expertise. Design supervision.

Client: Utena County Police Headquarters, Lithuania

  • 2011-2012 Technical Design for reconstruction the car parking of police station in Visaginas city.

 