STRUKTURES INTEGRATED DESIGN. TECHNOLOGICAL EQUIPMENT INSTALLATION.

LT | ENG | RUS
Certificates & Licences | Projects | Staff | Partners | Contacts
Certificates & Licences | Projects | Staff | Contacts
Projects | Vacancies | Contacts
Bank Details | Staff | How To Find Us
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

PROJECTS

Attention! This site uses cookies. If you do not agree, please leave our site. You can change your internet browser settings and delete saved cookies. We are using cookies to define a number of users visiting our website and visits frequency. We do not use software to collect personal data or individuals IP addresses. The data used exclusively in an anonymous way in a summary form for statistical purposes. We do not create an individual profile of your actions in the Internet. Name, email address, IP address, etc. will not be saved.

 

All projects of "TECOS" have been performed at a top level of engineering in accordance with strict national and international standards applicable for the nuclear industry.

 

 

 

Energy


Client: State Enterprise Ignalina Nuclear Power Plant, Lithuania

  • 2005 Working Design for changing of the water level different on rotating grids of coastal pump station bld. 120/2.

  • 2005 Working Design for changing in accompanying circuit of Control and Protection System and DAZ (additional emergency protection) system at INPP Unit 2.

  • 2005 Working Design for modification of start-up algorithm of switching the service water pumps of INPP Unit1.

  • 2006 Working Design of nitrogen gas supply system installation for INPP Unit 2 accident localization system.

  • 2006 Technical Design of emergency power supply of the main required equipment and devices in the case of full loss of the back-up power supply of INPP.

  • 2007 Technical & Working Design for reconstruction of the rooms 119, 130, 131, 141, 002 of INPP bld. 130/1 for installation of Cementation Facility for processing of the liquid radioactive wastes.

  • 2007 Working Design for installation of the beyond design accident fuel temperature monitoring sensors for reactor of the Unit 2.

  • 2007 Technical & Detailed Design of site preparation for construction of the Project B2 (SWMSF) facility.

  • 2008 Technical & Detailed Design for reconstruction of INPP technical documentation archive premises.

  • 2016 Access for personnel into INPP bld. 130/2 later on dismantling of bld. 129 options analysis. Technical Design preparation based on rational option.

  • 2016 INPP Information Centre options analysis for location and construction.

Client: AS Narva Elektrijaamad (Baltic power plant), Estonia

  • 2005 Technical Design for reconstruction of coastal pump station Nr.2.

  • 2006 Technical Design for reconstruction of fire protection system for transformers of coastal pump station.

  • 2006 Technical Design for reconstruction of pump station on 2nd rise of service and drinking water.

  • 2008 Preliminary & Working Design for reconstruction of main pipelines for heating water.

Client: NUKEM Technologies GmbH, Germany

Works & Services for Projects:

В-1 – Interim Spent Fuel Storage Facility (ISFSF).

В-2/3/4 - Solid Waste Management and Storage Facility (SWMSF).

В-9.2 - Development of the INPP Unit V1 equipment dismantling and decontamination project.

  • 2007 Project B-1. Engineering & Design documentation preparation for rod of camera assigned to inspect the irradiated spent nuclear fuel assemblies (SNF) located in the INPP cooling ponds.

  • 2007 Project B-1. Program of performance preparation for video inspection of heavy damaged fuel (HDSNF) located in the INPP cooling ponds.

  • 2008-2009 Project B-1. Development of heavy damaged spent nuclear fuel handling system & technological process. Technical Design & Engineering documentation.

  • 2009-2010 Project В-9.2. Structural and Architectural parts. Strategy development. Technical & Working Design; Knowledge transfer.

  • 2010-2015 Project B-1./ Fuel Bundle Handling Equipment (FBHE) - reloading machine. Installation design (IDD); Mechanical & Electrical installation; Existed equipments relocation; Participation in testing, cold trials & commissioning.

  • 2011 Project В-4. Gantry cranes 10t & 20t. Design (IDD); Mechanical installation; Civil works.

  • 2011-2017 Project B-1. SNF Transportation system. Transporter’s CONSTOR M2 laser positioning system for INPP Units 1&2. Design IDD+MDD; Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2011-2015. Projects В-1/3,4. Technological equipment’s installation detail design drawings preparation (IDDD) & design supervision. Prepared over 230 designs.

  • 2012-2017 Project B-1. Radiation Monitoring System (RMS). Design (IDD); Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2012-2013 Project B-3/4. General Designer functions fulfilment.

  • 2013-2017 Project B-1. Railway gates “Hertmans” replacement with „Sommer” gates. Design (IDD); Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2013-2017 Project B-1. Spent Nuclear Fuel Inspection Hot Cell (FIHC). Design (IDD); Technological equipment Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2014-2017 Project В-4. Gantry cranes 10t & 20t. Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2014-2017 Project B-1. Methane Gas System (MGS). Design (IDD); Mechanical & Electrical installation; Participation in testing, cold trials & commissioning. Warrantee period.

  • 2017-2019 Project В-1. Equipment for handling with damaged and heavy damaged Spent Nuclear Fuel (DSNF). Designs for manufacturing (MDD) & installation (IDD); Manufacturing arrangement; Design supervision; Delivery; Testing; Knowledge transfer; Training provision to Employer’s personnel.

Client: UAB МЕRКО Statyba, Lithuania

  • 2011 Technical & Working Design for external sewage system for Projects B-1/3,4.

Client: VT Nuclear Service Ltd. Responsibilities taken by Babcock Nuclear Ltd. UK

  • 2009-2012 Project В-9.2. Development of the INPP Unit V1 (gas circuit) technological equipment’s dismantling and decontamination designs.

Client: Lithuanian Energy Institute (LEI), Lithuania

  • 2011 Project В-9.2. Development of the INPP Unit V1 (gas circuit) technological equipment’s dismantling and decontamination designs.

Client: Gesellschaft für Nuklear Service mbH, Germany with participation of Lithuanian Energy Institute (LEI), Lithuania

  • 2010-2017 Project B-1. Casks CONSTOR М2 (102t.) Shock Absorbers Type 1, 2, 3 replacements at INPP Units 1&2. Design (IDD). Method statement. De-installation works, Installation. Warranty period.

  • 2013 Project B-1. SPH in the cooling ponds floor levelling. Conceptions development.

  • 2014-2015 Project B-1. SPH in the cooling ponds floor levelling. Design (IDD+MDD); Mechanical installation; Especial compounds pouring: ChockFast & Belzona.

  • 2015-2017 Project B-1. Cask’s CONSTOR М2 handling system equipment’s arrangement & installation. Warranty period.

Client: UAB Ekobana, Lithuania

  • 2005 Working design for installation of emergency operation recording devices INPP diesel generators.

Client: AB Pramprojektas, Lithuania

  • 2006 Technical design for relay protection and 6kV power distribution station of INPP B-1 Project (Interim Spent Fuel Storage Facilities).

Client: UAB ETB, Lithuania

  • 2006 Engineering documentation for installation of the new servo drives AZ/BSM for INPP Unit 2 Diverse Shutdown System.

Client: OU Altranet, Estonia

  • 2008 Technical Design for emergency renovation of unmovable support of heating line No.1 Narva city (Estonia).

Client UAB VILSTATA, Lithuania

  • 2009 Technical and Working Design of 1st level buildings 31A INPP.

  • 2009 Technical and Working Design for landscaping works of the Project B-10 (Free Release Measurement Facility - FRMF).

Client: UAB DUMTRAUKIS, Lithuania

  • 2009 Technical and working design for general renovation of brick build smoke stack Н=100m (with duct channel) located on INPP industrial boiler station site.

Client: UAB ЕТС, Lithuania

  • 2009 Technical and working design for demolition of existing brick build smoke stack Н=45 m and installation the new metal smoke stack Н=45 m located on INPP industrial boiler station site.

  • 2009 Technical and working design for demolition of existing steel smoke stack Н=35 m and installation the new metal smoke stack on existed foundation located on INPP industrial boiler station site.

  • 2009 Technical and working design for reconstruction of heating system of the industrial boiler station.

Client: UAB FIMA, Lithuania

  • 2009 Technical and detailed design of the cable bridge to the Projects B-10 (Free Release Measurement Facility - FRMF) building.

Industry


Client: OU Altranet, Estonia

  • 2008 Engineering and design documentation for adaptation of supporting steel constructions for storage tanks (GGS-5) of slate processing workshop located in VKG Oil AS plant. Kohtla-Jarve city, Estonia.

  • 2008 Engineering and design documentation for steel constructions of 1000 tones gas-producer of slate processing workshop located in VKG Oil AS plant. Kohtla-Jarve city, Estonia.

Client: UAB ESPro, Lithuania

  • 2007 Works implementation design for roof covering of workshop located in reinforced concert production plant.

Civil construction


Client: State Enterprise Visagino statybininkai, Lithuania

  • 2005 Technical & Working Design for reconstruction and restoration site 26.5ha for Project B-2 INPP.

Client: TUB Trevis ir KO, Lithuania

  • 2005 Technical & Working Design for car washing station.

Client: Visaginas municipality, Lithuania

  • 2006 Technical & Working Design for rearrangement and installation of the new equipment in the rooms of “Sedulinios” school.

  • 2008 Technical Design for reconstruction of the sport sites of “Atgimimo” school.

  • 2008 Technical & Working Design for reconstruction of engineering system of the children’s creativity house.

Client: Church of St. Panteleimon, Visaginas, Lithuania

  • 2009 Working Design for construction of laps and stairways in bell tower.

Client: UAB „Palink”, Lithuania

  • 2011-2012 Supermarket „IKI“ located in Visaginas reconstruction. Technical & Working design in the following parts: general, architectural, site preparation, structural, fire protection, internal & external engineering networks. Expertise. Design supervision.

Client: Utena County Police Headquarters, Lithuania

  • 2011-2012 Technical Design for reconstruction the car parking of police station in Visaginas city.

 


About Us | How To Find Us | E-Mail | ©2008 UAB "TECOS" | Last Updated 2018-07-30